Analysis of urban studies, taking into account the coordination of planning activities carried out in the area of the so-called Zawiszy Square in Warsaw.
The document prepared at the request of the Capital City of Warsaw contains the following elements:
1.1. analysis of the “Project of the Local Masterplan of the area located along the cross-city railway line on the section from the “Warszawa Centralna” railway station to the “Warszawa Główna” railway station, authors: Andrzej Kiciński, Architekt Sp. z o.o., Kana architekci Sp. z o.o., dated: July 2003 “, with regard to the so-called “Zawiszy Square”.
1.2. analysis of the project entitled “Materials for the Local Masterplan for the “Czyste” district area – phase IV, draft plan, prepared by Biuro Planowania Rozwoju Warszawy S.A., studio: Center, chief designer: M.Sc. Piotr Jaworski, Warsaw 2005 “in the scope of the so-called “Zawiszy Square”.
1.3. analysis of the “Draft Local Masterplan for the Prosta Street area in the “Wola” district of the Capital City of Warsaw. author: DAWOS Sp. z o.o., chief designer: dr inż. arch. Krzysztof Domaradzki with the Team, version under the name: “Available for public opinion” on 07.11. – December 8, 2003, in the scope of the so-called “Zawiszy Square”.
1.4. analysis of the “Draft Local Masterplan for the Twarda Street area in Warsaw, author: dr inż. arch. Krystyna Gruszecka, Warsaw, 2005 “, in the scope concerning the so-called “Zawiszy Square”.
1.5. proprietary transformation proposals in the area of the so-called “Zawiszy Square” in Warsaw. (AMC)